High Power Li-ion Battery
Overview
Tech Center
Model & Spec
  Tech Center
  Structrue Drawing
 
  Performance Characteristics
  Safety Test
  GBP possesses advanced testing machines in lab which can perform high capacity lithium battery safety tests complied with UL(1642) and IEC61960 and GB/Z18333.1-2001 standard as below. All lithium-ion batteries produced by GBP comply with below criteria.
Test Item
Test Procedure
Criteria
Vibration Test
 Cell status:4.2V (full charge)
  A. Amplitude: 0.19-0.38mm
  B. Frequency:30~35Hz  
  C. Direction: vibrated in three mutually perpendicular directions for 60 minutes
No fire, no leakage, no rupture, no smoke, no explosion the voltage is
no less than 3.6V
Shock Test
 Cell status:4.2V (full charge)
  A. Acceleration: 100m/s ; pulse lasting time 16ms
  B. Impacted for 1000 10 times
No fire, no leakage, no rupture ,no smoke, no explosion
Short Circuit
Test
 Cell status:4.2V (full charge)
  A. Copper wire of resistance less than 50mohm
  B. Short-circuited by connecting copper wire to positive and
negtative terminals of battery
No fire, no leakage, no rupture
no smoke, no explosion,
the tempeture is less than 150 ¡æ.
Overchage Test
 Cell status:4.2V (full charge)
  Charged at 1C/10V and the current is near 0V
No fire, no leakage, no rupture ,no smoke, no explosion
Crush Test
 Cell status: 4.2V (full charge)
  A. Crushed between two flat surfaces
  B. Until the battery is short inside and the voltage gets to 0V.
Smoke is allowed, no rupture,no fire, no explosion
High Temperature
Test
 Cell status: 4.2V (full charge)
  Leaving the battery at 100 ¡æ¡À 2 ¡æ for 20 minutes
No fire, no leakage, no rupture ,no smoke, no explosion

Drop Test
 Cell status: 4.2V (full charge)
  Dropped from 1.0m height onto 20mm or thicker concrete with p-tile on it 3 times in each direction at 25 ¡æ¡À 2 ¡æ.
No fire, no leakage, no rupture
no smoke, no explosion
Nail Penetrating
Test
  Cell status: 4.2V (full charge)
  Penetrated vertically with a 3.0~8.0mm diameter nail.
No fire, no rupture no smoke, ,no explosion
Impact Test
  Cell status: 4.2V (full charge)
  A. Hammer: 10.0kgs
  B. Height: 1m
  C. Battery: placed flat
  D. Drop freely the hammer from 1.0m height onto the battery.
Deformation is allowed, no fire, no explosion
 
COPYRIGHT © GBP Battery Co.,Ltd. All Rights Reserved
Add: No.2 Industrial Park, Fuyong Town, Baoan District, Shenzhen, China,
Email: sales@gbp-battery.com, Tel: +86 755 83046484 ÔÁICP ±¸05089795ºÅ